Planning a kitchen refresh: the order to buy appliances, cabinets and counters
By Today Offers Journal · Oct 11, 2026 · 5 min read

In a kitchen project, buying things in the wrong order leads to gaps, returns and delays. Follow this sequence from layout to appliances to counters, and see where sales timing helps.
A kitchen is a puzzle where every piece depends on another. The cabinets are sized around the appliances, the counters are cut to the cabinets and the plumbing and electrical work follows the layout. Buy a piece too early or too late and you may pay for changes, delays or returns. A clear order of decisions keeps the project steady, and it also shows where waiting for a sale is safe and where it is not.
Step one: fix the layout and the budget
Before you shop, sketch the room with measurements and decide what stays and what moves. Moving plumbing, gas or electrical lines costs far more than swapping surfaces, so changes to the footprint should be a deliberate choice. Set your budget with a contingency, as our renovation budget guide describes, and rank your priorities: what you cannot live without, what you would like and what can wait.
Questions to settle at this stage:
- Do you keep the same arrangement of sink, range and fridge?
- Do you need more storage, more counter space or better lighting?
- Will you keep any existing cabinets or appliances?
- What are the limits set by walls, windows, ventilation and the location of utility connections?
Step two: choose the major appliances
This surprises many people, but appliances are often chosen before the cabinets. The reason is simple: the cabinet maker or installer needs the exact dimensions and cutout sizes. A fridge that is a few centimetres wider than the opening cannot be fixed with a discount.
For each major appliance, collect these details from the specification sheet and installation guide:
- Product and packaged dimensions, including handles and door swing.
- Required clearances at the sides, top and back.
- Cutout sizes for built-in items such as cooktops, wall ovens and dishwashers.
- Connections needed: power, voltage, water, gas and venting.
- Ventilation needs and any minimum distance from the cooktop to the hood.
Our measuring guide and the gas or electric range article cover details. You do not have to buy the appliances immediately, but you must choose the models. If you are waiting for a promotion, keep the model number and watch the price, since a model change can alter the dimensions.
Step three: order the cabinets
Once you have the appliance sizes and the layout, the cabinets can be designed. Lead times vary, and made-to-order cabinets can take weeks, so order them early enough to arrive before the installers need them. Ask the supplier to confirm measurements in writing. For existing rooms, a professional measure helps, because walls are rarely square.
Check these before paying:
- What is included: doors, drawers, hinges, handles, filler panels, toe kicks and installation?
- Can damaged or wrong parts be replaced, and how long does that take?
- What are the return rules for custom orders? Many are not returnable, as explained in our custom orders article.
- Does the price include delivery, and where will the boxes be stored?
Step four: counters and sink
Counters are usually made to a template taken after the cabinets are installed. That is because small differences between the plan and the real room matter. Do not order the counter material until the cabinets are in place and the sink and cooktop are chosen, since cutouts depend on them.
Ask the fabricator how long the process takes between the template and the installation, because the kitchen may be without a counter during that time. Also ask what happens to the cost if the template measurement changes, and whether a damaged slab is replaced at no charge.
Step five: flooring, lighting and finishing
Finishes come late in the sequence. Choose them early so they fit the design, but buy and install them after the heavy work to avoid damage. For flooring, consider whether it goes under or around cabinets. That decision changes how much you order and the final height of the floor, which can affect the dishwasher and fridge clearances. Our flooring article explains how to calculate quantities.
Paint, lighting, hardware and small appliances are good candidates for sale timing. Watch local offers and flyers and buy when the price is right, as long as they will arrive before they are needed.
Where to save and where not to
- Save: on finishes that are easy to change later, such as paint, hardware, lighting and small appliances.
- Be careful about saving on: plumbing fixtures, cabinet boxes, hinges and drawer systems, which see heavy daily use and are costly to replace.
- Do not save on: safety work such as gas, electrical and ventilation. Use qualified professionals and follow local rules.
- Consider: a package deal for appliances if the models suit you, but compare it with separate prices, as in our washer and dryer comparison.
A short pre-order checklist
- Written measurements for the room, doors and delivery path.
- Specification sheets for every appliance.
- A quote from each supplier with lead times and return rules.
- A schedule that lists which items must arrive before others.
- A place to store deliveries without risk of damage.
- A contingency line in the budget, and a record of every change in writing.
Remember that the kitchen will be hard to use for a while. Plan simple meals, set up a small temporary space with a kettle, a microwave and a basic sink area, and decide in advance what you will do with the food in the fridge when the old appliance goes. A realistic plan for the disruption makes the delays easier to accept.
A kitchen takes patience, but a clear order makes it much calmer. Take photos at each stage and keep your documents in one place. If a decision feels rushed, pause and check whether it will affect the next step.
Frequently asked questions
Should I buy appliances before cabinets?
Choose the appliance models first, because their sizes decide the cabinet openings. You can wait to buy them for a sale, as long as you keep the same model and check the dimensions.
When should countertops be ordered?
Usually after the cabinets are installed, because the fabricator works from a template of the real layout. Ask for the lead time so you can plan the schedule.
Which kitchen items are best to buy on sale?
Paint, lighting, hardware and small appliances are often easier to time, while custom and made-to-order items follow a schedule. Always check return rules.
Ready to put this to use? Browse today's offers Share a deal you found
When to buy electronics and other big purchases
When the delivery date slips on a big order: your options and what to record
When a water heater or furnace fails: how to plan an emergency replacement